Friday, June 27, 2008
Workshop Renovation Part III
The third phase of the workshop renovation project was to design and build a modular set of work benches that contained tool lifts and formed a long miter bench. The specifications that these benches required was quite involved, After much designing and modifying, I finally came up with a usable design and built a prototype. -Read More
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment